Scope limits: Upstream
We ask for drawings or photos of the container, label length and gap, liner, adhesive, winding direction, and the destination plant’s voltage. Missing data stays listed as open rather than filled with a typical value from another beverage line. We do not substitute a published applicator m/min chart for the buyer’s container count. Integration Planning language on this site means those upstream facts are written before a factory is asked to price a cell.
Control boundary
We do not approve a web-speed brochure as package evidence. The brief asks which instrument, units and elapsed time the supplier will use on the buyer’s samples, and whether bottle rotation for overlap is demonstrated or only described. Certificates belong to a specific machine serial and market, not to this coordination desk. FAT and SAT signatures stay with the contract parties.